Multi-Bowl Wellheads

MBS with fluted mandrel casing hanger

Description

Features:
• Improved Safety – Less time working under the BOP stack.
• Significant time savings – No need to break the BOP stack.
• Accepts standard wellhead completion equipment.
• Available in most casing program sizes.
• Emergency slip hangers available in the event the casing becomes stuck.
• Casing Hanger running tool can be tested on the rig floor, prior to landing the casing.
• Cementing is done through the casing hanger running tool as soon as the string is landed in the bowl.
• Casing Hanger is fluted to allow returns around the outside of the hanger.
• MBS assembly can be installed under the rig floor, or lowered through the rotary.
• Back-pressure valve profiles available in all mandrel hangers.
• Upper housing can be removed and a conventional wellhead installed in its place.